Animal Waste
NC Farm
Alabama Farm
Alabama Farm
Design
Photos

ReCip® Photos In Alabama


The aerial photo shows the eight finishing barns, an existing lagoon below the barns, and the four new ReCip cells to the right (during construction in 2000).


A closer view shows the aggregate as it is being placed in each ReCip cell. The black pipe will become the pump chambers and cut to proper length when all the aggregate is installed.


Another view of the cells with the barns in the background. When completed, the ReCip system will treat up to 100,000 gallons per day of lagoon waste (solids & liquid).


A picture of the finished system with plants.


Watermelons were grown in the ReCip (2002)